Explore the benefitsBook a FREE Trial Today
Nationwide coverage you can rely on •Time saving tools - Cost saving results •Flexible hire solutions for every project •Expert guidance and ongoing support •Nationwide coverage you can rely on •Time saving tools - Cost saving results •Flexible hire solutions for every project •Expert guidance and ongoing support •

Everquip Buy Liftroller E Wagon for Efficient Steel Handling

Completed 28 February 2024
1 month
UK

Everquip

Project Client

Project type

Steel Industry

Everquip bought the Liftroller E Wagon to move steel beams and box sections around site without a forklift or four blokes on each lift.

Everquip Buy Liftroller E Wagon for Efficient Steel Handling

Everquip bought a Liftroller E Wagon rather than tying up plant every time steel had to move. The wagon carries beams and box sections on the flat, under its own power, with the operator walking beside it on a remote handset. It covers the part of steel handling that sits between the crane and the workface, which is usually the part still being done by hand.

The site

Steel is unforgiving to shift manually. A beam is heavy, long and awkward, the weight is rarely where you expect it to be, and there is nothing good to grab. Once the crane has put a bundle down in the laydown area, someone still has to get individual sections to the bench, the saw, the paint bay or the truck. That last leg is where the time goes and where people get hurt.

Placement is the other half of it. Steel is expensive and it is usually going somewhere with a tolerance on it, so you want the section arriving square and under control rather than being dragged and nudged into position. Do that on skates and bars and you are relying on the crew's arms for the pushing and, more importantly, for the stopping.

What they used

Everquip's pick was the Liftroller E Wagon, an electric material transport wagon rated to 1,200 kg and run on remote control. The remote is the part that matters for steel. The operator stands clear of the load and out of the pinch points instead of walking backwards in front of it, which is where most of the near misses happen.

For the horizontal runs either side of the wagon, the Liftroller Table gives an adjustable roller surface to slide sections along, and the Liftroller Trestle supports the length at 700 kg capacity while weighing only 5.8 kg, so one person can carry it out and set it up. Where steel has to be landed on a floor of a building rather than moved around a yard, Liftroller Floor forms the roller line that takes the crane load off the hook and onto the slab. Our page on steel beam handling explains how those pieces fit together on a live job.

How it worked on site

The pattern is straightforward. Steel is loaded onto the wagon at the laydown or the delivery point, the operator drives it to where it is wanted, and it comes off at working height rather than off the ground. Nobody carries a section further than they have to, and nobody walks a heavy load backwards.

Because it is electric it runs inside a shed without fumes, and because it is remote controlled one person can do jobs that would otherwise need a spare pair of hands. That changes how a small crew plans the day. The bloke moving steel is not pulled off other work every time something needs shifting, and the fabricators are not stopping to help lift.

What it changed

Everquip report smoother steel handling on site, less manual lifting of heavy sections, and better productivity across their operations. The safety side is the plain one: fewer hand lifts on heavy, awkward steel means fewer chances for the sort of injury that puts a fabricator off the tools for weeks.

Buying rather than hiring made sense for them because the wagon is in use most days. If your steel only moves in bursts, hire is often the better call, and the trade offs are set out in our guide to loading platform hire in Australia.

If you are still moving beams and box sections by hand in a Sydney yard or on a site, talk to our team and we will bring a wagon out for a free trial.

What Our Customers Say

Don't just take our word for it - hear from satisfied customers who've experienced the LiftAU difference

Jack Hendy
Owner, The Pastry Room
"The Liftroller E Mover proved incredibly useful for moving boxes around our warehouse, significantly reducing physical strain and saving valuable man-hours."
Liftroller E Mover Equipment HireUK
Isak Digre
Manager, Hent Danmark A/S
"In less than an hour, we hauled more than 12 tonnes of plaster through the window."
Construction Material HandlingDenmark
Mats Sveen
Supervisor, Bunde Bygg A/S
"With Liftroller, everything was much easier, and the workers did not have to wear themselves out. Absolutely brilliant!"
Construction Material TransportNorway
Christian Hegland
Chairman, Berland Bygg A/S
"By renting a Liftroller, you will quickly recover the cost, especially considering all the sick leave avoided. It's a win-win situation."
Construction Equipment RentalNorway

Ready to Roll?

Stop dragging your materials. Get your logistics moving.

Get a Quote