Handling facade, glass and curtain wall material
Facade work means getting heavy, fragile panels to each floor without damaging them or the building. Liftroller lands panels through the opening and rolls them to the installation zone, with a gentle lock that does not mark the facade.
The problem
- Glass and curtain wall units are heavy, fragile and costly to break in a bad lift.
- On refurbishment work you cannot cut into or damage the existing facade to get material in.
- Panels staged at ground level get handled repeatedly before they reach the fixing point.
How Liftroller solves it
- The Liftroller Wall lands panels through an existing opening and its patented lock holds without damaging the facade, so there are no repairs after use.
- The Crane places heavy panels and units precisely with an electric winch or manual chain hoist.
- Roll panels to the installation zone on the wagon so they are handled once, not five times.
The kit for this job
Talk to us about facade, glass & curtain wall
Tell us what you're moving, your site access and your dates. We'll recommend the right Liftroller setup and send pricing.



