Liftroller has signed an agreement with 4 Cladding Services

Get a quote for your site
Leave your details and we'll call you back with pricing and the right system for the job.
Getting hold of the right material handling kit in the UK has been the awkward part of working with us until now. That has changed. We have signed an agreement with 4 Cladding Services, who will supply the full Liftroller range for hire and for purchase across the UK.
What UK contractors can get
The whole range is available through 4 Cladding Services, for hire or to buy:
- Liftroller Wall systems for moving material up and into a building through the facade
- Liftroller Floor for landing crane loads on the working level, with a 1,500 kg working load limit
- Liftroller E Wagon for shifting heavy material once it is inside, up to 1,200 kg on remote control
- Liftroller E Mover for tight interior work through standard doorways
The rest of the range, including the Liftroller Stacker, Table, Crane and Trestle, is available through the same arrangement.
Facade work is where getting material to the right level stops being a detail and starts being the programme.
Why 4 Cladding Services
They know facades. That is the short version, and it is the reason this works.
Cladding and facade contractors deal with the exact problem Liftroller was built for: heavy, awkward, expensive material that has to get to a specific level of a building without being damaged and without tying up a crane all day. A supplier who has done that work themselves asks better questions than a general hire desk.
The practical side matters too:
- National coverage, so a job outside London is not a problem
- Technical support from a team who can help with installation and keep units running
- Local presence, which means a quicker answer when something is needed at short notice
Weighing up Liftroller for a job?
Leave your details and we'll call you back with pricing and the right system for the load.
Hire or buy
Both are on the table, and the right answer depends on how often you will use it.
Hire suits a single project or a short programme. Short term rental for a specific job, longer hire for an extended contract, terms set around your dates, and delivery and collection included.
Buying starts to pay once you are running several jobs a year. The same units move between sites, so the cost per project drops each time. Financing is available, as is operator training and ongoing technical support.
If you want to see the arithmetic rather than take our word for it, we have set it out in our cost savings breakdown.
The Opus XVI hotel remodelling in Bergen, where the protected facade set the terms for everything else.
The problems this is meant to solve
UK sites, particularly urban ones, keep hitting the same four walls:
No room at ground level. You cannot store what you cannot fit, so material has to arrive close to when it is installed and go straight to the level it belongs on.
Access through the existing building. Standard doorways, existing lifts with weight limits, corridors that were never designed for a pallet.
Safety expectations that keep rising. Manual handling of heavy facade material is the kind of thing that gets picked up on an audit, and rightly so.
Programme pressure. Crane time is expensive and shared. Anything that takes lifts off the crane pays for itself in the programme, not just the budget.
Our systems were built around those constraints rather than adapted to them. If you want to see how the pieces fit together, the Liftroller system overview walks through it.
A single crane lift straight into the level that needs it, rather than a queue at the hoist.
Where to see it working
Two jobs are worth a look if you want the detail rather than the pitch. Skanska used Liftroller Wall to convert retail spaces without shutting down the shopfront, and 8Build trialled the E Mover on their Waterloo refurbishment in central London.
If you are weighing a cantilevered deck against a rolling system before you commit, we compared them properly in cantilevered platforms versus Liftroller Floor.
Getting started
If you have a UK job coming up, the useful first conversation covers the building, the access, the heaviest thing you need to move and your dates. 4 Cladding Services can arrange a site visit and a quote for hire or purchase, and you can also contact us directly if you want to talk the specification through first.
Quick answers
Frequently asked questions
Either works. 4 Cladding Services handle hire, sales, delivery and support in the UK, so for a live job they are usually the faster route. If you would rather start with us, get in touch and we will point you to the right person.
4 Cladding Services are our UK partner for hire and purchase across the range. Practically, that means one place to go for the whole system rather than sourcing pieces from different suppliers, which is the point of doing it this way.
Yes, and it is the sensible order to do it in. A short hire on a live job tells you far more than a yard demo, because it puts the kit up against your actual doorways, your actual loads and the way your crews actually work.
Yes. Training comes with a purchase and can be arranged with a hire. It is a proper handover rather than a certificate course. The controls are simple, so most of it is about load paths, ground conditions and where crews put things down.
It depends on whether the material comes in through the facade or gets landed on the slab. Liftroller Wall covers the first case, Liftroller Floor covers the second. Send through the building details and we will tell you which one your job needs rather than selling you both.
Handled in the UK through 4 Cladding Services, which is a large part of why the agreement exists. Waiting on a part from overseas while a unit sits idle is not a workable way to run a programme.
Talk to our team about Liftroller
Tell us about your loads and access constraints and we'll recommend the right Liftroller setup. No obligation.
Related Articles
CantiDeck style Loading Platforms vs Liftroller Floor: Why Contractors Are Making the Switch
A fixed cantilevered deck and the Liftroller Floor both land material at height, but they cost you in different places. Here is the honest comparison, including where the fixed deck still wins.
City Centre Fit-Out Logistics Cheat Sheet: The Complete Contractors' Guide
Most fit-out overruns in a city centre come from material sitting in the wrong place, not from the work itself. Access, permits, hoists, storage and the numbers, in one checklist.
What Is a Cantilevered Loading Platform? Everything you need to know
A cantilevered loading platform bolts to the structure and extends over open space, so a crane can land material straight onto the floor that needs it. Here is how they work, when they are worth it, and when they are not.